A Re-Fitting Year
Refitting Santana began at KKMI, Richmond, Calif., in July 1998. She went back into the water and her masts were stepped in May 1999, but it was July of the same year before she really set sail once again.
|
 |
|
 |
|
 |
|
|
The vessel was hauled using four straps to spread the load. |
|
A complete inspection was done. |
 |
|
 |
|
 |
| Removing very old hull fastenings. |
|
The interior was a complete mess. |
|
|
|